top of page

Royden House

IMG_1140 (1).png

Park Road North, Birkenhead Park

Design House is situated in the heart of Liverpool’s business district, just off Old Hall Street which had been vacant since 2016 and was previously used as a Leisure Club. The building sits within the Castle Street Conservation Area and so the development works had to be sensitive to the area and in keeping with the council planning constraints.

This building was originally part of the American embassy complex before it was knocked down in 1902 to make way for a branch of the Mersey Tunnel which runs directly under the site. The new building was built around 1912 when it appears again on the Gore’s Directory. In its new form it was a cotton warehouse, brewery, leather goods shop and a design studio for Littlewood’s catalogue.

Work included

  • Electrical installation

  • Plumbing installation

  • Kitchens

  • Bathrooms

  • Joinery Package

  • Flooring

  • Decoration

  • Communal fire alarm and emergency lighting

  • Window refurbishment and several replacements

  • Roofing repair

  • Landscaping

  • Driveway installation

  • Exterior painting

  • Sandstone restoration

  • Obtained all compliance paperwork for the client prior to occupation by end users

The site consists of 14 dwellings, 12no. 1 bed apartments and 2no. Self-contained 2 bed apartments and is Grade 2 Listed. The building was the original site of Birkenhead Head School and was built around 1847. It was converted into nurse’s accommodation for the nearby Birkenhead General Hospital which closed in 1982.

Works carried out on this Grade 2 building had to be done sensitively to comply with its listed building status with only like for like changes to the exterior of the building, this included removing graffiti from the sandstone façade and remaking several sash windows to exactly the same specification as the originals. The 2 acres of mature gardens were tendered to and new driveway covering installed.

Overview

  • Composition: 14no. Apartments

  • Project Type: Heavy Refurbishment

  • Package: Turn-key

  • Duration: 4 months

  • Cost: £280,000

  • GDV: £1.575M

Ready to Start Your Project?

bottom of page